Sewer
The Sewer Department is responsible for the operation and maintenance of the wastewater treatment plant, twelve pumps stations, and approximately 35 miles of sewer mains. This page includes a list of the tasks accomplished by the Sewer Department team.
Mission Statement
The primary goal of the Sewer Department is to protect our natural resources through the effective and efficient collection and treatment of the waste water discharged by the residential, industrial and commercial members of the Lisbon community that are connected to the sewer system.
Laboratory Work
Collect required samples to complete lab testing
Conduct pH testing on Influent and Effluent
Settleable solids testing is done on the Influent and Effluent
Settle-o-meter testing is done on the contents of the aeration tank
Check the Dissolved Oxygen level of the aeration tank and adjust it if necessary
Total Settleable Solids (TSS) testing is done on the Mixed Liquor, Return Activated Sludge (RAS), Sludge Holding Tank (SHT), Influent and Effluent
Biochemical Oxygen Demand (BOD) testing is done on the Influent and Effluent
Daily Rounds
Check the level of the Sludge Holding Tank to determine wasting needs
Exercise the Return Activated Sludge pump and grab the RAS sample
Check sludge blanket depth in the clarifier
Rake the aeration tank discharge bar rack
Visually review operation of all systems
Additional Seasonal Requirements
April 15th to October 31st the Effluent is chlorinated requiring additional testing
Maintain a Chlorine Residual in the Effluent of 1.0mg/L or less (levels tested twice a day)
De-chlorinate the Effluent sample used for the BOD testing
E-Coli Testing is done 2 days a week
Sludge Dewatering
Sludge dewatering is done to remove excess solids from the plant system on an as needed basis. The amount of solids in the system will determine how often we dewater during the week. We typically dewater twice a week for 8 hours a day. Once dewatered the sludge is hauled to a composting facility by an outside vendor.
Miscellaneous Activities:
Empty the rag cans in the Headwork's building as needed
Empty the Grit Hopper in the Headwork's building on days that the Sludge container is picked up
Chlorine contact chambers cleaned on a quarterly basis
Clean the splitter box and clarifiers
Building maintenance and improvements
Manhole ring and cover replacements
General grounds keeping at the treatment plant and pump stations
Snow plowing